Fluid Cooler and Chiller Upgrades
This project included the replacement of five rooftop air cooled fluid coolers and two rooftop chillers. We also replaced drain valves and air separators, chilled water pumps and fluid cooler pumps. All work completed on this project was performed on a live and operational facility without disruption.
Location
Akron, OH
Duration
1.5 Months
MOPS
11
Value
$570,000